Oxfordshire Conference Centre Heritage Evacuation Lift

Our Client:

  • Client Type: The Ditchley Foundation (via Main Contractor)
  • Building Type: Heritage Commercial / Institutional (Grade I Listed)
  • Location: Oxfordshire, UK
  • Objective: Critical Life Safety Upgrade

Oxford conference centre, a distinguished Palladian country house, is a significant heritage asset and home to The Ditchley Foundation. Implementing upgrades requires meticulous respect for its historic fabric while ensuring paramount safety and accessibility. iKONIC Lifts was tasked with a critical life safety project: delivering a compliant evacuation passenger lift with a dedicated secondary power supply to guarantee uninterrupted lift service for emergencies.

conference centre oxford

iKONIC Challenge: Integrating Critical Safety Systems into a Grade I Listed Building

  • Challenge Type: Historic Building Renovation & Life Safety Upgrade
  • Building Constraints: Respecting Grade I listed fabric, ensuring minimal disruption, and integrating modern systems discreetly.
  • Additional Challenges:
  • Providing a passenger lift suitable for assisted evacuation.
  • Ensuring reliable operation during mains power failure.
  • Meeting stringent BS 9999:2017 and evacuation lift guidance.
  • Coordinating lift and dedicated emergency power for lifts in historic properties.

The primary challenge was to install a state-of-the-art evacuation lift system within a historically sensitive environment, ensuring it could operate reliably during power outages, thereby safeguarding all occupants, especially those with mobility impairments.

iKONIC Solution: Bespoke Evacuation Lift & iKONIC Evac Power System

  • Solution Type: Integrated
  • Custom Evacuation Passenger Lift Solutions & Dedicated Secondary Power Supply
  • Lift Type: iKONIC Evacuation Passenger LiftKey Features:

Assisted evacuation functionality.

Seamless integration with historic architecture.

iKONIC EVAC POWER UPS for dedicated secondary power supply.

Point-of-use inverter for enhanced reliability.

Key-operated emergency controls.

iKONIC Lifts designed and delivered a complete evacuation lift solution, integrating a purpose-built passenger lift with our specialised iKONIC EVAC POWER UPS system. This system provides a dedicated secondary power supply for evacuation lifts, engineered to ensure uninterrupted lift service for emergencies. The point-of-use inverter enhances reliability, while key-operated controls ensure secure emergency operation.

The EVAC POWER system is designed to support a minimum of 10 upward and 10 downward evacuation journeys within a 60-minute period, meeting critical performance requirements for fire safety lift systems for heritage sites.

iKONIC Result: Compliant Safety, Preserved Heritage

Outcome: Successful Grade I Listed Building Lift Installation delivering a fully compliant evacuation system.

Benefits:

Fully Compliant Evacuation Lift: Meets all regulatory requirements for assisted evacuation.

Reliable Secondary Power: Guarantees lift operation during power failures.

Enhanced Occupant Safety: Critical for mobility-impaired individuals during emergencies.

Preserved Historic Integrity: Discreet integration respects the building’s heritage.

Purpose-Designed Solution: A synergistic system, not a generic backup.

Compliance:

      • BS EN 81-20/50 (Lift Design & Installation)
      • BS EN 81-72 (Evacuation Lift Guidance)
      • BS EN 81-28 (Remote Alarms)
      • BS EN 81-73 (Behaviour in Fire)
      • BS 9999:2017 (Fire Safety in Buildings)

Ready to Elevate Your Project?

Contact iKONIC Lifts Today for a Evacuation Lift Solution!

  • Total Project Time 20 Weeks
  • Our PeopleConsultant
    Project Manager
    2 x Engineers
  • Installation Time 4 Weeks
  • Location Building, UK