North London Apartment Lift. Client: Millway – New Build Apartments
Client Type: Residential Development
Location: Millway, North London
Project: Three-Story Apartment Building (Six Apartments)
Objective: Install a Lift for Accessibility
iKONIC Lifts provided an accessibility solution for Millway, a new build apartment building in North London, by installing a platform lift to serve all three stories and six apartments.

Challenge: Positioning the Lift Controller in a North London Apartment
Challenge Type: Lift Installation in New Build
Building Constraints: Positioning of Lift Controller
Solution: Creating a Channel Under the Floor
The main challenge was the client’s desired position for the lift controller, which was resolved by creating a channel under the floor to safely route the cables.

Solution: Energy-Efficient Platform Lift with Varispeed and Standby Mode
Solution Type: Platform Lift
Key Features: Varispeed, Standby Mode, Energy Efficiency, ISO 14001 Compliance
Installation: Factory-Trained Engineers
iKONIC Lifts provided a perfect platform lift solution, appealing to the client due to its energy efficiency with varispeed, standby mode, and compliance with ISO 14001.

Result: Enhanced Accessibility, Increased Marketability, and On-Time Completion
Outcome: Successful Lift Installation
Benefits: Enhanced Accessibility, Increased Property Marketability, On-Time Completion
Compliance: Building Control Inspection
The lift installation was completed on time for the building’s completion and building control inspection, providing easy access to all floors and making the properties more marketable.