Art Deco Theatre Lift Installation

Art Deco Theatre Lift Installation. The Regal Theatre, Tenbury Wells – A Historic Venue

Client Type: Theatre

Building Type: Art Deco, Grade II Listed

Location: Tenbury Wells, UK

Objective: Provide Wheelchair Access to Auditorium

iKONIC Lifts was thrilled to assist The Regal Theatre, a stunning Art Deco Grade II listed building in Tenbury Wells, in providing wheelchair access to the auditorium following flood damage and refurbishment.

regal thearter, ikonic client

Challenge:

Art Deco Theatre Lift Installation. Uneven Walls and Limited Space in a Historic Art Deco Theatre

Challenge Type: Lift Installation in Historic Building

Building Constraints: Uneven Walls, Limited Space

Additional Challenges: Flood Damage, Coronavirus Outbreak

The primary challenge was installing a wheelchair lift in a historic building with uneven walls and limited space, made more complex by recent flood damage and the ongoing coronavirus outbreak.

Solution: iKONIC Hiro 350 Incline Platform Lift with Post Mounting

Solution Type: Incline Platform Lift

Lift Model: iKONIC Hiro 350

Key Features: Straight Inclined Platform, Three-Sided Access, Increased Capacity (300kg), Post Mounting

iKONIC provided the ideal solution with the German-engineered Hiro 350 Straight Inclined Platform Lift, featuring three-sided access and an upgraded 300kg capacity. To overcome the uneven walls, the team opted for post-mounting the incline track.

Result: Enhanced Accessibility and a Smooth, Safe Lift Operation

  • Outcome: Successful Lift Installation Project
  • Benefits: Enhanced Accessibility, Smooth and Safe Operation, Code Compliance
  • Compliance: Machinery Directive 2006/42/EC, BS EN 81-40

The completed lift installation provides easy access to the main theatre for all, ensuring a smooth and safe operation. The iKONIC Hiro 350 complies with Machinery Directive 2006/42/EC and BS EN 81-40 standards.

Make Your Venue Accessible to All.

Contact iKONIC Lifts for Incline Lift Solutions!

  • Total Project Time 6 Weeks
  • Our PeopleConsultant
    Project Manager
    2 x Engineers
  • Installation Time 1 Day
  • Location Building, UK